2360295: Kerry Technology Park, Dromthacker, Tralee
See site notice for full description. Below is a brief description set to the character limit of the Planning Portal. Astellas Ireland Co., Ltd., intend to apply for permission for development of a pharmaceutical ‘Fill-Finish’ production facility over two construction phases. The application seeks a 10 year duration of planning permission. The proposed development will include: (i) a 3 storey pharmaceutical ‘Fill-Finish’ Production Building with an overall total building floor area of 19,989 sqm and maximum height to roof parapet of approximately 24.63m constructed over 2 no. phases. (ii) a Central Utilities Building (CUB) with floor area of 663 sqm and maximum height to roof parapet of approximately 10.135m to include vent outlets. (iii) A Woodchip Boiler Building constructed in Phase 1, with a floor area of 359 sqm and maximum height to roof parapet of 9.26m to include 2 no. flues. (iv) Electrical Switch Room and ESB Sub-Station Building constructed in Phase 1, with a floor area of 37 sqm and maximum height to roof parapet of approximately 2.965m; (v) a Security Office Building constructed in Phase 1, with floor area of 63 sqm and maximum height to roof parapet of approximately 4.965m; (vi) a Sprinkler Pump House constructed in Phase 1, with floor area of 40 sqm and maximum height to parapet of approximately 4.21m with associated Sprinkler Water Tank; (vii) a Waste Water Pre-Treatment Plant, with 1 no. associated storage tank constructed in Phase 1 and a second associated storage tank constructed in Phase 2; (viii) Utilities and Services Yard (ix) Site infrastructure works (x) Site boundary fencing and site landscaping; (xi) A temporary contractor’s compound and parking area for the duration of the construction works. The applicant also intends to submit a concurrent planning application to alter electrical cable infrastructure on adjoining and overlapping lands. A Natura Impact Statement (NIS) has been prepared and will be submitted to the Planning Authority with the application.
- Status
- Conditional
- Lodged
- 8 Nov 2023
- Decided
- 19 Dec 2023
- Type
- Permission
- Council
- Kerry County Council
- Council record
- eplanning.ie/KerryCC/AppFileRefDetails/2360295/0
- Town
- Tralee
- Street
- Sold prices on Kerry Technology Park
View location on OpenStreetMap
Other applications on Kerry Technology Park
- 2561153Kerry Technology Park, Dromthacker, Tralee · Conditional · 10 Dec 2025
- 2460694Kerry Technology Park, Dromthacker, Tralee · Conditional · 16 Sept 2024
Recent applications in Tralee
- 2660829Parkboy Ballyroe, Tralee, Co. Kerry · 1 Sept 2026
- 2660805Ballindooganig, Ballyseedy, Tralee · 26 Aug 2026
- 2660807Pairc na Feile, Brosna West Brosna, Tralee · 26 Aug 2026
- 2660795Lisloose, Tralee, Co. Kerry · 24 Aug 2026
- 2660775Unit 7 The Horan Shopping Centre, Clash West, Tralee · 19 Aug 2026
- 2613171 Rock Street, Tralee, Co Kerry · 18 Aug 2026
Source: National Planning Application Database (NPAD), Department of Housing, Local Government and Heritage (CC BY 4.0); look the application up on the council's ePlanning register for documents and the current status. A lodged application is not an approval; an approval is not proof of completed works. Applicant names are not published.